Product Systems
Book a call

Ship the right things.Ship more of them.

Not a strategy deck, not a build shop. I take the seat, and what I leave behind is a roadmap cut to what matters, a cadence your team keeps, and AI agents on the work that no longer needs a person.

The problem

Your market is moving. Your roadmap isn't.

Headcount used to set shipping speed. It doesn't anymore. The teams pulling ahead are rebuilding how the work runs, not just who does it, and they open the gap faster than a hiring plan can close it.

Add headcount

Two more PMs and three more engineers. The bottleneck was never how many people were deciding.

Buy an agency

You get output. You do not get a team that can keep shipping after the invoice clears.

Run an AI pilot

A demo that impresses the leadership team and never touches the work anyone actually does.

Each of those solves about a third of it. The gap is throughput, and throughput is a system: what gets decided, in what order, by whom, and how much of it a machine can now carry.

Three ways in · one engagement

Start where it hurts. It usually spreads.

Start

Get a v1 out of the building

Discovery through to a shipped first version. Problem framing, a roadmap cut to what matters, and product leadership in the loop until it launches.

When there is no v1 yet
Scale

Install the cadence

Operating rhythm, a prioritization system people actually use, and design and eng unblocked. The team ships without me by the end.

When v1 shipped and throughput stalled
AI agents

Put agents on real work

Scope the workflow, build the agent, embed it where the work already happens, hand it over. Dropped where the ROI is not there.

When the work itself is the bottleneck

Most engagements start at one door and end up touching all three. You are hiring one operator across product, design, ops and AI, not three vendors with three statements of work.

Engagement shapes

Four shapes. Pick one on the call.

Audit
1 week
Sprint
2 weeks
Build
+2
6–8 weeks
Retainer · ongoing
monthly

Fixed fee, agreed in writing before we start. No hourly billing, no change orders for thinking.
Fees are quoted on the scoping call, once we both know which shape this is.

How an engagement runs

Four moves, every engagement.

FIRST

Discover

Where the work actually stalls, from the people doing it. Prototypes and proofs of concept in front of users early, built by product and design instead of queued behind engineering. Your team learns to build them too.

THEN

Scope

One written cut of what ships, what waits, and what gets killed. Made with engineering, design, data and the stakeholders who would object in week five, so the objection lands now instead.

THEN

Ship

I am in the seat with decision rights, running the cadence. Real experiments with a stated hypothesis and a kill criterion, so shipping produces evidence rather than output.

LAST

Implement and embed

Documentation, a named owner on your side, and the change management that makes it stick. I am not done when the work ships. I am done when your team runs it without me.

Running through all four: the people side

The operating model is changing, so the role definitions have to change with it. I rewrite skills, expectations and job descriptions for how the work is actually done now. What a PM owns when a prototype takes an afternoon. What senior means when an agent handles the first draft. How you hire and evaluate against that.

Teams that skip this part install a new system and keep appraising people against the old one. That is where the system quietly dies.

Fit

Worth being clear about this early.

This works well for

  • Leaders who need product leadership now, whether or not a full-time hire is on the table. Venture-backed, bootstrapped or privately held
  • Product and ops leaders whose team doubled while throughput did not
  • Operators carrying manual work that a scoped agent could take over
  • Teams that can decide and pay without a procurement gauntlet

This is not for

  • Teams that want a strategy deck
  • Teams that want code written and nothing else changed
  • Anyone looking to replace a full-time product hire permanently
  • Education and education-adjacent organizations

Where the experience comes from

Two decades in the seat.

Questions I get

Straight answers.

You are a sitting CPO. Is that a conflict?
No, and it is the point. I take outside work selectively, the day job comes first, and I decline anything adjacent to it. That includes education and education-adjacent organizations.
Is this an AI thing?
Agents are one way in. Most work starts at Start or Scale and picks up agents where they pay for themselves.
Do you build?
I lead product. Your team builds, or trusted builders do. You are hiring judgment and cadence, not hands on a keyboard.
How fast can you start?
Audit in a week. Sprint in two. Build in six to eight. Scoping call to signed scope is usually under two weeks.

Next step

Thirty minutes is enough to know.

Bring the thing that is stuck. You will leave with a read on it either way, and a straight answer on whether I am the right person for it.

Prefer a warm intro? Say who sent you and it moves to the top.